NYCT Resiliency Protection of the Steinway Under the River Tube
Contract: C-34924
Contract Value: $2,900,000
Contractor: Rising Sun Construction
Project Scope
-
Installation of electrical isolation flanges along the existing 8-inch sump discharge lines within the Steinway tube—the under-river tunnel connecting Manhattan and Queens on the 7 line.
-
Isolation of the 8-inch pipe system in entirety from its hangers, executed using electrical insulative tape at approx. 1,500 locations.
Project Achievements
-
All work completed during 53-hour track outages.
-
Made possible only via close coordination with work train operators & extensive knowledge of work trains within the tunnel allowing the level of precision required for successful maneuvering.