NYCT Resiliency Protection of the Steinway Under the River Tube

Contract: C-34924

Contract Value: $2,900,000

Contractor: Rising Sun Construction

​​​​

Project Scope

  • Installation of electrical isolation flanges along the existing 8-inch sump discharge lines within the Steinway tube—the under-river tunnel connecting Manhattan and Queens on the 7 line.

  • Isolation of the 8-inch pipe system in entirety from its hangers, executed using electrical insulative tape at approx. 1,500 locations.

 

Project Achievements

  • All work completed during 53-hour track outages.

  • Made possible only via close coordination with work train operators & extensive knowledge of work trains within the tunnel allowing the level of precision required for successful maneuvering.